Die Seite /en/products/geomatics/antenna-rods/nestle-gnss-pole-carbon/14011000 existiert nicht.
Sie wurden auf /en/nestle-gnss-2-segment-carbon-pole-with-cable-routing-holes umgeleitet.

NESTLE GNSS 2-segment carbon pole with cable routing holes

Low weight - comfortable handling!

Top Features

  • Amazingly light weight less effort is required.
  • The carbide tip does not wear out - thus no falsification of the measurement result due to blunt tips.

Variants

Equipment

Technical Data

Connection 5/8"
Diameter rod 32 mm
Weight 520 g
Length 200 cm (2 x 100 cm)
Product Number (PID) 14011000

Highlights at a Glance

  • For GNSS measurements of all kinds.
  • The two-piece GNSS pole is ideal for surveying tasks where numerous measurements need to be taken.
  • For plumb positioning, the lower part of the rod is equipped with a circular bubble.
  • The aluminium tip contains a pressed-in pin made of indestructible tungsten carbide, which shows no signs of wear even after prolonged use under the toughest conditions.
  • The carbon ensures comfortable handling even in cold temperatures.
  • The two segments of the pole can be transported in a space-saving way in the bag included in the delivery. Additional top segments can be used to extend the pole by 1 m each if required.
  • The upper segment has two guide holes with rubber sleeves to accommodate the antenna cable.
  • PP-2-H, art. no. 14011000, 2-segment carbon rod with cable guide holes

Description

The required accuracy in data acquisition presupposes the use of a professional pole. The carbon rods from NESTLE impress with their light weight, durability and convenient handling.

Scope of Delivery

NESTLE GNSS Pole (PP-2-H)

Request

Rückruf?

Wünschen Sie einen Rückruf?

Tage

An welchen Tagen erreichen wir Sie am Besten?

Uhrzeit

Zu welcher Zeit passt es an den gewünschten Tagen?

Privacy

I have read the Privacy Policy. I agree that my information and data may be collected, stored, and processed electronically. Your data will not be shared externally, and if no collaboration occurs, the data will be deleted within 6 months.